
Construction works and installation of a gypsum slurry drying facility within the premises of the Rovinari Energy Complex
We designed and built a modern 3-story hall, adapted to accommodate complex technological equipment. We arranged an efficient sludge storage platform, ensuring optimal management. We designed and constructed internal roads to provide easy and secure access to the premises. We implemented piers to provide solid support and strengthen the overall structure of the construction. We also designed and installed a specially designed dehydration system to efficiently process the gypsum sludge from the desulfurization plant of the Rovinari Power Plant Branch.